Annealing System
HPT developed a complete production line to heat exhaust coupling for the automotive applications. The system was design to load a liner, verify the size is correct to less than a 1mm push it into the next stage were it is heated to 1000°C in 6 seconds. The liner is then passed through various gas blades to prevent oxidation and cool it down so that it can be handled by the operator. The completed part is then push out of the system into a collection container.